Contractors, Consultants, Developers
Plat Review
All plat applications are reviewed as part of the Development Review Committee. Submit applications for preliminary and final plats to the Planning and Development Department on the lower level of City Hall, 1000 Throckmorton St.
Civil Plan Review
New public infrastructure improvements associated with residential, commercial and industrial development are reviewed by the city's Infrastructure Plan Review team. To submit a civil plan, visit the Infrastructure Plan Review Center, located at the south end of City Hall, 1000 Throckmorton St.
Visit the Infrastructure Plan Review Submittal page for checklists and instructions.
Forms & Permits
Visit the Permits page to download application packets.
Traffic Counts
Lookup traffic counts for Fort Worth streets.
Standards and Detail Drawings
Streetlight Detail Sheets:
- Street Luminaire Electrical Connection Details
- Street Luminaire General Notes
- Street Luminaire Pole Details
- Street Luminaire Pole Foundation Details
- Street Luminaire Conduit & Ground Box Details
- Street Luminaire Electrical Service Exterior Details
- Traffic Signal
Traffic Signal Detail Sheets:
- Electrical Service Details
- Electrical Service Details Pedestal Service
- General Notes (Sheet 1 of 2)
- General Notes (Sheet 2 of 2)
- Ground Box and Detector Details
- Miscellaneous Traffic Signal Details
- Specifications for Traffic Signal Poles and Mast Arms
- Traffic Control Plan Details (Sheet 1 of 2)
- Traffic Control Plan Details (Sheet 2 of 2)
- Traffic Signal Design Guidelines
- Traffic Signal Pole Foundation Details
- Type 170 Cabinet Installation Details
- Wiring Connections Details
Typical Construction Details:
Typical Pavement Markings:
- Typical Pavement Markings (Sheet 1 of 3)
- Typical Pavement Markings (Sheet 2 of 3)
- Typical Pavement Markings (Sheet 3 of 3)
Parkway Standards:
Street Development Standards:
- Street Development Standards Document (PDF)
- Standard Roadway Cross Sections-Urban (PDF)
- Standard Roadway Cross Sections-Rural
- Design Standards For Turn Lanes
- Design Standard Tables
- Pavement Design Standards
Water Details:
Storm Water Design Manual:
- City of Fort Worth Storm Water Management Design Manual
- Runoff Coefficents Table 2.1.4-2
- Preliminary SWM Checklist
- Conceptual SWM Checklist
- Dam Safety Checklist
- Final SWM Checklist
- Errata Sheet
Cover Sheet Drawing Details:
Street Permit Center
Address:
311 W. 10th Street
Fort Worth, TX 76102
Hours:
8 a.m. to 5 p.m. Monday-Friday
Phone: 817-392-6594
Bids and Requests
- Summer Bus Services (Bid No. 10-0337)*
- Firefighter Bunker Boots (Bid No. 10-0312)
- Library Shelving and Furnishings (Bid No. 10-0321)
- Sanitary Sewer Rehabilitation Contract LXVII (67) Part 3 (Project No. 00473)
- Sanitary Sewer Rehabilitation Contract LVI (56) - Part 2 (City Project No. 01029)
- Ed Collett Park Renovations
- Water and Sanitary Sewer Relocations for SH-121T (City Project No. 01332)
- Sanitary Sewer System Rehabilitation (DOE Project No. 0640)
- PVC Sewer Fittings (Bid No. 10-0324)
- Six Pocket Trousers and Shorts (Bid No. 10-0345)
- Firefighter Helmets (Bid No. 10-0348)
- Legal Collection of Deliquent Revenue (RFP No. 10-0347)
- Clearfork Main Street Bridge (City Project No. 00107B)
- 2009 and 2010 Water and Sanitary Sewer Replacement Contracts (RFQ)
- Ninth Street Pedestrian and Streetscape Enhancements & Hyde Park Transit Plaza (Revised)
- Emergency Generator (Bid No. 09-0285)
- On-Site Employee Health Center Administrator/Operator (09-0229)*
- Digital Archiving Project for the Central Library (RFP 09-0245)*
Download project documents and information through Buzzsaw
Upcoming Projects
Download a list of upcoming capital projects and their projected bid dates. (pdf, 87kb)
Master Consultant six-month look ahead (pdf, 19kb)